New energy vehicle motor, power battery case Siemens
New energy vehicle drive motor drying
Ⅰ Main technical parameters of drying the driving motor of new energy vehicles
1、Technology: stator shell, pallet belt size L520*W400*H264mm;Production beat 96S/ piece;Weight: 7kg shell ' 40kg tray;Input temperature: 220 ℃ of shells and tray at room temperature;Output temperature: room temperature plus or minus 2 ℃;Cooling time: 25min;
2、Inner size:Length of cooling zone 9000* height of feed inlet 350* inner width 500mm
3、External dimension (about) : total length: 10000* height: 1600* width: 700mm;The cooling zone length is 9000mm (in four sections);The length of each air pumping area is 500mm.
4、Shell temperature: outer furnace wall temperature does not exceed ' 10 ℃ at room temperature;
5、Wind direction: forced draught in the cooling area from top to bottom.Both ends draw air from the bottom to the top
6、Power supply:380V,50HZ/Three-phase five-wire system,380V,50HZ;
7 Power:12KW
Ⅱ Structure characteristics of drying furnace of driving motor of new energy vehicle
1、Enclosure material: it is made of 1.5mm cold plate, with phosphating surface, high temperature electrostatic spraying, corrosion resistance and easy cleaning.Enclosure color "RAL9002", mobile parts color "RAL1003";
2、Inner material: made of 1.5mm thick SUS304 stainless steel plate to keep the inner clean and free from dust, rust and corrosion;
Ⅲ Function of drying equipment for driving motor of new energy vehicle, control system:
1.The system has level 4 access details and passwords
2.According to different product parameters, the engineer is required to add/remove programs, and the operator can choose different baking programs.
3.The equipment can continue to operate after the accidental power failure or fault restart.
4.The program is provided to customers for backup
5. Equipment alarm: alarm information should be displayed;
Ⅳ New energy vehicle driving motor drying training
Free technical training